
3.12 Installing the peristaltic pump
■■■■■■■■■■■■■■■■■■■■■■
30
■■■■■■■■
858 Professional Sample Processor
The two pump connectors are located on the rear side of the tower. Con-
nect a pump as follows:
1
Connecting the connection cable
■ Plug the M8 plug of the pump connection cable into one of the
"Ext. Pump" connector sockets. Correct orientation of the 3 con-
tact pins must be observed.
■ Tighten the knurled screw at the front end of the plug by hand in
clockwise direction. This will secure the plug.
The pump connectors (3-pole M8 plugs) supply 16 Volt feed voltage and
may not be loaded with more than a maximum of 600 mA.
3.12 Installing the peristaltic pump
1 2 3 4 5 6 7 8 1
9 10 3
6.2744.160
Figure 31 Installing the pump tubing
1
PEEK pressure screws, short
(6.2744.070)
2
Tubing olive (6.2744.030)
3
Stopper
The colors of the stopper indicate the inner
diameter of the pump tubing.
4
Tubing cartridge (6.2755.000)
5
Contact pressure lever
6
Union nut
7
Adapter
8
Tubing olive
9
Pump tubing
10
Snap-action lever
Kommentare zu diesen Handbüchern